WORKS FOR THE IMPROVEMENT OF THE IMC SYSTEM IN BOLOGNA CENTRALE.

Our improvement proposal consists in inserting all the control components necessary for monitoring the mechanical equipment systems, the lighting system and the fire-fighting systems. The control will be carried out with a Supervisory Control and Data Acquisition (SCADA) system that will acquire all the data from the various subsystems and will be able to manage the energy consumption of the plants and the building thanks to the network of gauge installed on the electrical panels power supply of the tooling and electrical systems serving the building. In addition to electricity consumption, the consumption of water and gas used by the equipment systems will be monitored. The supervisory system, by communicating via the BACnet protocol with the appropriately implemented BIM model, will allow to improve management and the maintenance of what has been achieved.